Powered By Kitlog Pro v2.0
Kupe's Zodiac 650B
Zodiac 650 B
Engine
11-19-2018
< Previous Log Entry
Next Log Entry >
Date:
11-19-2018
Number of Hours:
6.00
Manual Reference:
Brief Description:
Cabin Heat 5: Pilot Side Install
Spent the day completing the pilot side cabin heat by finishing all the tasks already accomplished on the passenger heat. Cabin heat complete.
Pilot side skeet hose test fit before final assembly.
Pilot side cabin heat control cable installed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Zodiac 650 B Home
Category
# Logs
# Hours
All
774
1452
Avionics
35
54
Brakes
21
35
Canopy
38
72
Cockpit
34
54
Electrical
73
120
Engine
71
127
Flight Test
1
1
Fuel
26
48
Fuselage
136
252
Landing Gear
19
28
Miscellaneous
28
54
Polishing
8
24
Rudder
25
70
Shop
7
8
Stabilizer
37
77
Wings
215
428
Copyright © 2001-2024 Matronics. All Rights Reserved.