KitLog pro

Powered By Kitlog Pro v2.0

Kupe's Zodiac 650B
' style=
Date:  8-27-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Avionics Bay Wiring Cleanup 5

Continued re-routing, anchoring, adjusting, coiling, and wrapping the avionics bay wiring. I finally reached a point where I began making more progress finalizing the wiring than I was disassembling it. More of a two-steps forward - one step backwards as opposed to the previous days of one step forward - two steps backward.

The biggest updates today were the addition of 5 cable tie mounts on the avionics shelf to route and secure the basic "loose" wiring (wires not part of the Dynon or ULPower wiring harnesses). I placed the cable ties in the spaces I left between the various Dynon black boxes which make natural channels for routing these wires across the avionics shelf. With these anchors in place, I was better able to re-run major portions of the wiring and secure them in place for the next "layer" of wires.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.