KitLog pro

Powered By Kitlog Pro v2.0

Kupe's Zodiac 650B
' style=
Date:  8-6-2020
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Wing Top Side Polishing 2

More polishing. Same process. Got as far as finishing the forward half of the entire right wing with three passes of the course grade polish.
' style=

My

My "before" picture is of the right wing.

' style=

After picture of the left wing, front half polished.

After picture of the left wing, front half polished.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.