KitLog pro

Powered By Kitlog Pro v2.0

Kupe's Zodiac 650B
' style=
Date:  8-20-2019
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Right Side Wing Walk Polishing

Began polishing the right wing walkway to prepare the surface for the no-slip tape for the walkway and NO STEP placard for the flap. With the Hangar at 106 degrees (and 62% humidity) that was all I had the energy for.
' style=

Right side after 4 passes with Nuvite II grade F.

Right side after 4 passes with Nuvite II grade F.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.