KitLog pro

Powered By Kitlog Pro v2.0

Kupe's Zodiac 650B
' style=
Date:  5-28-2018
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Safety Wiring Day

Took some time off to begin my cataract surgery. Right eye complete (and 20/20) - left eye in a few days.

Spent the day installing safety wire in several places that needed it. This included:

- Left and right flap hinges.
- Left and right aileron hinges.
- Belly access door (including shortening the pin and drilling the safety wire holes).
- Nosewheel strut steel spring adjustment bolts.
' style=

Nose gear adjustable strut spring safety wired.

Nose gear adjustable strut spring safety wired.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.