KitLog pro

Powered By Kitlog Pro v2.0

Kupe's Zodiac 650B
' style=
Date:  9-19-2017
Number of Hours:  3.00
Manual Reference:  
Brief Description:  First Engine Run Prep

No Pictures.

Spent the day prepping for tomorrow's first engine run. Primary tasks included:

- General cleanup around the aircraft.
- Removed the upper and lower engine cowls.
- Detailed run through the engine compartment inspecting wire/fuel/air connections and bolt security.
- Pumped up the tires so the plane is ready to roll a little ways out of the hangar area.
- Set up all the engine sensor indicators on the Dynon Skyview Engine Management System to conform to the ULPower engine limits in their operating manual (this took over an hour!).
- Marked the position of 2 securing clips for the engine tailpipe for future welding.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.