Date:  9-12-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Internal Fuselage Wiring 1

No Pictures.

I set out to finish off the internal fuselage wiring today and got sick with the flu about 1 hour into the session so I knocked off ... for a week! The work that needs doing includes:

- Finish tying down all the ELT-related wiring (power, ground, GPS data, RJ-11 cable and antenna cable)
- Readjust the ADAHRS cable bundle - maintenance loop is not positioned correctly.
- Install the outside air temperature sensor and run its wire to the ADAHRS.
- Secure the elevator trim wire cable running forward from the tail section.

I'll pick these tasks back up at a later date.