Powered By Kitlog Pro v2.0
Kupe's Zodiac 650B
Zodiac 650 B
All
10-22-2016
< Previous Log Entry
Next Log Entry >
Date:
10-22-2016
Number of Hours:
0.50
Manual Reference:
Brief Description:
Fuel Plumbing Through the Cabin Complete
Drilled out the right side fuel hose pass throughs for the feed and return lines. I need to order a grommet for the feed line, but otherwise fuel line routing through the cabin is complete.
Right side fuel hose cut outs complete.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Zodiac 650 B Home
Category
# Logs
# Hours
All
774
1452
Avionics
35
54
Brakes
21
35
Canopy
38
72
Cockpit
34
54
Electrical
73
120
Engine
71
127
Flight Test
1
1
Fuel
26
48
Fuselage
136
252
Landing Gear
19
28
Miscellaneous
28
54
Polishing
8
24
Rudder
25
70
Shop
7
8
Stabilizer
37
77
Wings
215
428
Copyright © 2001-2024 Matronics. All Rights Reserved.