Continued with the avionics bay wiring cleanup today. No pictures today. Tasks accomplished include:
- Attached the Dynon EMS voltmeter line to the +12V battery post via ring terminal. - Disconnected all the Dynon cables from the various Dynon avionics. - Unplugged all the grounding wires from the grounding block. - Installed the battery into the ELT audio alert indicator (alarm).