Routed the pilot side EGT/CHT wires to the EGT/CHT probes. Began by routing the wires down the left firewall stiffener flange with 2 adel clamps and trimming them to match the probe connector wire lengths. Connected the probes to the wires. Temporarily tied everything off with cable ties.
Next I wired up the fuel pressure, oil pressure, and oil temperature probes using butt splices, tied all the wires together then wrapped the wires in a flame-resistant braided wrap and temporarily attached it to the middle engine mount strut.
Completed EGT/CHT wires adel clamped to firewall side stiffener and across lower engine mount strut.
Oil & fuel sensors butt spliced to EMS harness.
Fuel & Oil sensor wires after wrapping with flame-resistant braided wrap.