KitLog pro

Powered By Kitlog Pro v2.0

Kupe's Zodiac 650B
' style=
Date:  4-28-2016
Number of Hours:  0.50
Manual Reference:  
Brief Description:  ACK (ELT) Control Head Instal

Received my 4-40 metal screws and locking nuts in the mail yesterday, so this morning I installed the ACK control head.
' style=

From the cockpit - ACK control head installed

From the cockpit - ACK control head installed

' style=

From the avionics bay: ACK control head installed.

From the avionics bay: ACK control head installed.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.