Started work on the engine mount today which included:
- Preliminary fitting to check for fit of the weld pads. - Trim (via grinder) of the weld pads that are bolted to the firewall to make sure they fit in between the firewall stiffeners. - Updrill of the 4 engine mount bolt holes in the firewall to their final 3/8" size. - Test attachment of the engine mount to the firewall.
With the fitting complete, the next step for the mount is to paint it.
Engine mount loosely held in place during test fit.
Engine mount from the front. So far the garage door still closes!