KitLog pro

Powered By Kitlog Pro v2.0

Kupe's Zodiac 650B
' style=
Date:  6-4-2015
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Unpacking New Shipment

Spent Wenesday and Tursday morning inventorying sorting and storing the new shipment. The engine shipment (and associated firewall forward kit) include cowlings, mount, ground adjustable propeller, electronic control unit (ECU), 2 x fuel pumps, fuel hoses, oil cooler & hoses, battery mount, electrical cables, exhaust pipes, muffler, electric fuel selector, and all of those other engine compartment items like air/oil separator, voltage regulator, coil packs, and baffling.

On the avionics side, I received a Dynon 10" skyview screen and added the Dynon radio, intercom, transponder, ADS-B, GPS, backup battery, engine monitoring kit, and the supporting devices like ADAHRS, antennas, backup battery and the like.

It was several hundred parts in all and I ended up refilling all of my previous emptied shelves for the 5th time after the tail kit, wing kit, fuselage kit, finishing kit, now this one. Home stretch!
' style=

The ULPower engine crate just after opening.  Lots of extra boxes.

The ULPower engine crate just after opening. Lots of extra boxes.

' style=

The engine crate with everything else removed.

The engine crate with everything else removed.

' style=

Shelves filled back up with engin and avionics parts.

Shelves filled back up with engin and avionics parts.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.