KitLog pro

Powered By Kitlog Pro v2.0

Kupe's Zodiac 650B
' style=
Date:  7-17-2014
Number of Hours:  2.00
Manual Reference:  6-B-16
Brief Description:  Baggage Floor Rivet

Finished off the baggage floor by riveting it in place this morning. Was a mostly straightforward job except for the far aft and far forward side rivets being a bit of a challange. In both cases, using a small hand riveter with the mandrel bent slightly inboard I was able to get acceptably-pulled rivets in all 4 corners.

After finishing the riveting, I masked off the baggage floor, baggage bulkhead, upper seat support and center seat back channel in preparation for painting them. Hopefully I can get to that tomorrow.
' style=

Fully riveted baggage floor.

Fully riveted baggage floor.

' style=

Cockpit, sides, and area behind the baggage bulkhead masked off and covered.

Cockpit, sides, and area behind the baggage bulkhead masked off and covered.

' style=

Ready for paint...

Ready for paint...

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.