Brief Description: 2. Bulkheads Final Installation
Permanently installed the 3 bulkheads in preparation for installing the canopy. I had already done the fitting and updrill for all the parts while installing the rear top skin, but never finished installing the bulkheads. Today I deburred, filed, sanded and painted all three bulkheads and their attach points on the fuselage, then riveted everything together after the corrosion control paint dried. They're a permamnent part of the airplane now.
All three bulkheads riveted into place.
The baggage bulkhead with diagonal braces and rear baggage floor flange installed.