|
|
|
|
Kupe's Zodiac 650B
|
Date: 4-13-2014
|
Number of Hours: 5.00
|
Manual Reference: 6-B-5, 16, & 23
|
Brief Description: Rear Frame Channel, Upper Seat Back
|
|
A bunch of reassembly today with updrilling to final rivet size, deburring, filing and sanding throughout. In order, here are the tasks completed:
- Reinstalled firewall and updrilled the bottom to final rivet size. - Reinstalled replacement front upper longerons. - Re-leveled the entire airplane (took close to an hour to get just right). - Updrilled the rear torque tube bearing support where it attached to the floor (now that I can get underneath the airplane). - Deburred, filed, sanded rear torque tube bearing support and reinstalled. - Updrilled upper seat back then deburred, filed, sanded and reinstalled. - Updrilled rear frame where it attaches to the floor then deburred, filed and sanded the entire rear frame assembly. - Added rudder and elevator fairleads to the rear frame then reinstalled.
|
|
Firewall and longerons back on - fuselage level and square again.
|
|
Upper seat back reinstalled after updrilling and cleanup.
|
|
Rear frame reassembled with fairleads installed.
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |