Brief Description: Center Spar Final Prep and Rudder Fairleads
Cleaned up and finished off the center spar by:
- Deburing and filing all rivet holes and/or sharp edges. - Sanding most of the edge surfaces - Drilling out the outboard wing attach bolt holes through all 4 wing uprights - Updrilling and installing (bolting) the forward torque tube bearing onto the front side of the center spar - Fabricating two fairleads for the rudder cables to pass them through the center spar.
Center spar ready for final installation onto the cabin floor.
Close up of forward torque tube bearing and two fairleads (which will be riveted after rigging).