KitLog pro

Powered By Kitlog Pro v2.0

Kupe's Zodiac 650B
' style=
Date:  3-6-2014
Number of Hours:  1.50
Manual Reference:  6-B-16
Brief Description:  Baggage Floor Complete Drillout

Finished drilling out the baggage floor to pilot hole size by measuring, setting and drilling rivet holes for the two spanwise supports underneath the baggage floor. These two cross members are the upper channel (cross connecting the two upright channels) and a z-angle that crosses the fuselage about 2/3 the way back along the baggage floor.

Having already drilled out the perimeter of the baggage floor previously, it was a fairly straightforward job to locate the two rivet lines that matched up with the center of the two cross pieces.
' style=

Baggage floor after drilling it out to pilot hole size.

Baggage floor after drilling it out to pilot hole size.

' style=

Baggage floor from the front - the instrument panel is just visible in the lower right of the pic.

Baggage floor from the front - the instrument panel is just visible in the lower right of the pic.

' style=

Did a little updrilling on the forward fuselage skin to gather more silver clecoes.

Did a little updrilling on the forward fuselage skin to gather more silver clecoes.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.