KitLog pro

Powered By Kitlog Pro v2.0

Kupe's Zodiac 650B
' style=
Date:  3-2-2014
Number of Hours:  2.00
Manual Reference:  6-B-16
Brief Description:  Baggage Floor Initial Drill Out

Measured out the rivet lines for the perimeter of the baggage floor paying special attention to where the Upper Channel, the Rear Baggage Floor Angle (attached to the Baggage Back Bulkhead), and an additional spanwise Z-angle fell across the baggage floor skin. I then match-drilled the perimeter of the baggage floor skin, removed the skin, and inspected the holes at the ends of the Upper Channel and Z-angle to confirm their position on the skin. Next I'll drill out rivet lines in the baggage skin for those to spanwise supports and drill them out.
' style=

Baggage floor perimeter drilled out to the seat back, side L-angles, and the rear baggage bulkhead

Baggage floor perimeter drilled out to the seat back, side L-angles, and the rear baggage bulkhead

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.