Got started on installing the wing locker door dzus fasteners. Got the 6 holes lined and drilled out and finished installing the lock springs on 2 of the holes. Something to finish up in my next session.
Wing locker door with all dzus fastener holes drilled. Aft dzus strip laying across the top.
Finished fastener on inboard side. Unfinished hole in the foreground