KitLog pro

Powered By Kitlog Pro v2.0

Kupe's Zodiac 650B
' style=
Date:  11-18-2013
Number of Hours:  2.00
Manual Reference:  6-WLO-1
Brief Description:  Wing Locker Door

Measured out rivet lines in the wing locker door to attach strengthening L-angles to it. Once the rivet lines were drilled out, I cut L-angles to size and drilled them out to make a strengthening frame for the door. Added shims to the fore-aft L-angles as they attach on top of the spanwise L-angles.
' style=

Wing locker door after fitting and drilling out the L-angle stiffeners.

Wing locker door after fitting and drilling out the L-angle stiffeners.

' style=

Wing locker door deburred, sanded and painted - ready for final assembly.

Wing locker door deburred, sanded and painted - ready for final assembly.

' style=

Completed wing locker door clecoed in place for a test fit of its curvature.

Completed wing locker door clecoed in place for a test fit of its curvature.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.