Today's task was to finish riveting the left wing, which I did in about 2.5 hours. The challenge with today's riveting was that everything was on the bottom side (wing tip and flap hinge/rear channel). So it was slow going, one rivet at-a-time instead of the line-'em-up/pop-'em'down in rapid fire on top sides.
I also installed the landing light lens.
Finally, I began measuring the garage for ceiling storage. I have 4 locking hoists due in tomorrow, and I've built a wood frame to set the wing on before hoisting it to the ceiling.
Landing light lens installed
Completely riveted left wing including flap and wingtip..