Powered By Kitlog Pro v2.0
Pietenpol Build Log
Pietenpol Air Camper
Fuselage
3-10-2014
< Previous Log Entry
Next Log Entry >
Date:
3-10-2014
Number of Hours:
3.30
Manual Reference:
Brief Description:
Setting sides
Using a lasar level I had, I was able to shim the table for the fuselage assembly to within 1/32".
Unit attached to camera tripod
Laser line
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Pietenpol Air Camper Home
Category
# Logs
# Hours
All
48
175
Engine
4
8
Fuselage
19
72
Miscellaneous
5
5
Wings
20
90
Copyright © 2001-2024 Matronics. All Rights Reserved.