Powered By Kitlog Pro v2.0
Pietenpol Build Log
Pietenpol Air Camper
Fuselage
3-8-2014
< Previous Log Entry
Next Log Entry >
Date:
3-8-2014
Number of Hours:
6.50
Manual Reference:
Brief Description:
Joining Fuselage Sides
After completing the other side of the fuselage, I will begin to bend and join the halves.
Three Dimensional!
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Pietenpol Air Camper Home
Category
# Logs
# Hours
All
48
175
Engine
4
8
Fuselage
19
72
Miscellaneous
5
5
Wings
20
90
Copyright © 2001-2024 Matronics. All Rights Reserved.