Powered By Kitlog Pro v2.0
Pietenpol Build Log
Pietenpol Air Camper
Wings
7-3-2013
< Previous Log Entry
Next Log Entry >
Date:
7-3-2013
Number of Hours:
6.00
Manual Reference:
Brief Description:
Leading Edge
The leading edge work is progressing but going slowly as I wait for glue and filler material to dry as I move to each step. Spent some time in the wood shop doing detail work on a few steel fittings.
In the wood shop
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Pietenpol Air Camper Home
Category
# Logs
# Hours
All
48
175
Engine
4
8
Fuselage
19
72
Miscellaneous
5
5
Wings
20
90
Copyright © 2001-2024 Matronics. All Rights Reserved.