Powered By Kitlog Pro v2.0
Pietenpol Build Log
Pietenpol Air Camper
Wings
6-10-2013
< Previous Log Entry
Next Log Entry >
Date:
6-10-2013
Number of Hours:
2.15
Manual Reference:
Brief Description:
Leading & Trailing edge work
Removed clamps from leading edge plywood and began pulling the plywood back around the spars. A piece of the trailing edge was tacked into place with glue and held with bungee cords. Gussets will secure it in place next.
Bending plywood
Glue tack
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Pietenpol Air Camper Home
Category
# Logs
# Hours
All
48
175
Engine
4
8
Fuselage
19
72
Miscellaneous
5
5
Wings
20
90
Copyright © 2001-2024 Matronics. All Rights Reserved.