Powered By Kitlog Pro v2.0
Pietenpol Build Log
Pietenpol Air Camper
Wings
6-8-2013
< Previous Log Entry
Next Log Entry >
Date:
6-8-2013
Number of Hours:
2.50
Manual Reference:
Brief Description:
Leading Edge Plywood
I did a rough shaping of the leading edge with a plane. I then glued the edge of the plywood into the notched portion of the leading edge. Once the glue dries I will be able to bend and glue the plywood to the spars.
Clamped Plywood
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Pietenpol Air Camper Home
Category
# Logs
# Hours
All
48
175
Engine
4
8
Fuselage
19
72
Miscellaneous
5
5
Wings
20
90
Copyright © 2001-2024 Matronics. All Rights Reserved.