Powered By Kitlog Pro v2.0
Pietenpol Build Log
Pietenpol Air Camper
Wings
1-21-2013
< Previous Log Entry
Next Log Entry >
Date:
1-21-2013
Number of Hours:
2.50
Manual Reference:
Brief Description:
Wing Fittings
Worked on fittings for 2nd wing. Pictures show how I nibble the edges close using a hand shear. This helps reduce grinding. Fittings are all made and need painted.
Hand Shear
Nibbled Clean
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Pietenpol Air Camper Home
Category
# Logs
# Hours
All
48
175
Engine
4
8
Fuselage
19
72
Miscellaneous
5
5
Wings
20
90
Copyright © 2001-2024 Matronics. All Rights Reserved.