Powered By Kitlog Pro v2.0
Pietenpol Build Log
Pietenpol Air Camper
All
3-4-2013
< Previous Log Entry
Next Log Entry >
Date:
3-4-2013
Number of Hours:
6.15
Manual Reference:
Brief Description:
Left Wing
A lot of detail work. Put a coat of spar varnish on areas that steel straps will go to protect the wood underneath. Lined up the center section straps and drilled them. Glued plywood reinforcement on strap areas.
Spar Varnish
Drilling for CC Straps
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Pietenpol Air Camper Home
Category
# Logs
# Hours
All
48
175
Engine
4
8
Fuselage
19
72
Miscellaneous
5
5
Wings
20
90
Copyright © 2001-2024 Matronics. All Rights Reserved.