Powered By Kitlog Pro v2.0
Pietenpol Build Log
Pietenpol Air Camper
All
1-24-2013
< Previous Log Entry
Next Log Entry >
Date:
1-24-2013
Number of Hours:
2.25
Manual Reference:
Brief Description:
Mounting Hardware
Began drilling holes in the spars to mount the hardware. This is always a scary thing to do! By using a drill guide, I was able to drill straight holes. Backing up the holes with a piece of scrap wood ensures clean holes with no break out.
Guide & back up wood clamped
Drilling Holes
Clean, straight holes
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Pietenpol Air Camper Home
Category
# Logs
# Hours
All
48
175
Engine
4
8
Fuselage
19
72
Miscellaneous
5
5
Wings
20
90
Copyright © 2001-2024 Matronics. All Rights Reserved.