KitLog pro

Powered By Kitlog Pro v2.0

ALAN'S WEB SITE
' style=
Date:  8-13-2011
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Air Box Seal

This morning, I decided to complete the seal between the air box and the cowling. I have experimented with a number of widths of material putting the cowling on and off. So, it's time to rivet the material in place.

The directions say to pop rivet the material in place, but my pop rivet tool doesn't fit inside the mouth, so you need to rivet it from the outside. I tried squeezing rivets and a few different arrangements and am fairly happy with the way it turned out.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.