Cory began work on the Dynon EGTs. I am impressed with how long Cory takes to think everything through. I just dive in and screw things up. Cory probably spent 45 minutes checking and thinking through the installation.
We decided on a location just over 2 inches down from the manifold being careful to keep the finished EGTs from interfering with the cowling.