Powered By Kitlog Pro v2.0
ALAN'S WEB SITE
RV-9A
Fuselage
12-6-2008
< Previous Log Entry
Next Log Entry >
Date:
12-6-2008
Number of Hours:
0.50
Manual Reference:
34A
Brief Description:
Landing gear mount
The longer bolts came in earlier this week so this evening I installed them. (They still need to be torqued.) With the bolts competed, I believe everything on drawing 34A are complete.
Bolts installed
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
903
1811
Avionics
42
63
Canopy
93
207
Cowling
29
69
Electrical
102
171
Empennage
133
311
Engine
90
178
Firewall Forward
35
59
Fuselage
170
342
Inspection
15
38
Miscellaneous
46
44
None
4
0
Panel
49
121
Prop
24
38
Tools
2
4
Wings
69
166
Copyright © 2001-2024 Matronics. All Rights Reserved.