KitLog pro

Powered By Kitlog Pro v2.0

ALAN'S WEB SITE
' style=
Date:  4-26-2010
Number of Hours:  1.25
Manual Reference:  
Brief Description:  Flap Actuator Weldment

My goodness it was a job getting the flap actuator weldment back into the plane. I started out with the motor channels in place. (I took it out with the channels in place... but sure couldn't get it back in.) I finally ended up taking the channels out and still had a heck of a time.

Before installing the weldment, I installed the bolts holding the push-rod end. The bolt enters from the fuselage skin side and would be impossible to install after the weldment was in place.

I torqued the bolts and cleaned up the inside of the fuselage.
' style=

Push-rod installed FIRST

Push-rod installed FIRST

' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.