Brief Description: Left Horizontal Stabilizer Skin
Constructed the horizontal stabilizer jig. (Mounted to table and leveled) Clecoed the skin to the left stabilizer. - Nose ribs - Front spar - Main ribs - Rear spar Started match drilling the holes (Finished the bottom side)