KitLog pro

Powered By Kitlog Pro v2.0

ALAN'S WEB SITE
' style=
Date:  2-6-2011
Number of Hours:  1.75
Manual Reference:  
Brief Description:  ADAHRS Tubing run

After much pondering, I decided to run the tubing for the angle of attack and pitot static to the center section of the plane. There, I tee'd the pitot tubing and used a 90 degree for the angle of attack. I ran both tubes through the same tie wraps I used for the strobe and other center run wires.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.