KitLog pro

Powered By Kitlog Pro v2.0

ALAN'S WEB SITE
' style=
Date:  3-17-2010
Number of Hours:  3.20
Manual Reference:  
Brief Description:  Cowling - Top to Bottom Connection

This evening I worked on the piece of aluminum that connects the top and bottom pieces of the cowling together. I countersunk the holes in the fiberglass with the aluminum strip in place. This kept the tools from walking. Next, I mixed up a batch epoxy and slathered on the metal. Then, I squeezed the rivets in place.

Finally, I cleaned up the oozing epoxy:-)
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.