KitLog pro

Powered By Kitlog Pro v2.0

KEVIN'S WEB SITE
' style=
Date:  6-10-2010
Number of Hours:  3.75
Manual Reference:  
Brief Description:  Finish left ruddervator

Finished drilling holes in left ruddervator. Deburred all holes. Clecoed and riveted all ribs to elevator skin. Riveted hinge to elevator after ribs were fully riveted, Used 42-ccp rivets. Had some challenges with the pneumatic riveter, however, got it figured out. Christian and Lora did some of the rivets.. Had to drill out 2 rivets. Boy, those rivets are stong!! Gives me confidence that this is going to be one solid plane!
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.