KitLog pro

Powered By Kitlog Pro v2.0

KEVIN'S WEB SITE
' style=
Date:  6-9-2010
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Left Ruddervator prep work

Measured and marked rivet locations for ribs and rib root. Began drilling with #40 drill bit, used silver clecos initially. Followed up with #30 in some of the holes. Used copper clecos for those holes.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.