KitLog pro

Powered By Kitlog Pro v2.0

Chuck S. Sportsman 2 +2 Site
' style=
Date:  9-21-2006
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Horizontal Stab Attach Bracket

-located bracket-read thru construction details specified in step 74 of section 8(fuse assembly)-established a centerline on the bracket and bulkhead D-confirmed the a/c still laterally level-temporarily fastened a short level to the top of the bracket-proceeded with incremental adjustments to obtain a final (clamping position) for the bracket that conforms to specifications and details contained in the manual
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.