KitLog pro

Powered By Kitlog Pro v2.0

Chuck S. Sportsman 2 +2 Site
' style=
Date:  9-15-2006
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Sanding the top of the vertical fin shells (Step 4

- Leveled the A/c. - Checked to see if the top of the vertical fin shell were parallel with one another. Removed some material until the shell edges became parallel.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.