KitLog pro

Powered By Kitlog Pro v2.0

Chuck S. Sportsman 2 +2 Site
' style=
Date:  9-14-2006
Number of Hours:  5.75
Manual Reference:  
Brief Description:  Fuse step 29 and 30

Waterline-read thru details for establishing a/c waterline and executed the procedure. This involved; levelling the a/c along the lateral axis and fixing this position, establishing for and aft endpoints for the waterline on each side of the fuse by setting up and referencing lateral level lines near the most forward and aft stations of the existing fuselage, pulling a line taught between the end points and marking the position of the line on the fuselage at locations prescribed in the construction manual.Forward fuse attach plates (fittings)-Reviewed construction manual details for installing the two inboard and two outboard forward fuse attach fittings -Gathered composite components required for the procedure and made miscellaneous preparations as required -Cut pieces of fibreglass cloth to size for the fittings on an offset bias (four pieces per fitting)-catalyzed 100g of promoted resin in accordance with mixing ratios prescribed in the manual-saturated the 16 pieces of fibreglass cloth and installed them accordingly
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.