Powered By Kitlog Pro v2.0
Chuck S. Sportsman 2 +2 Site
Sportsman 2 + 2
Fuselage
9-11-2006
< Previous Log Entry
Next Log Entry >
Date:
9-11-2006
Number of Hours:
8.50
Manual Reference:
Brief Description:
Fuse Step 6
Placed A/c on a stand.-read thru construction details for the upper, lower, and aft shell attach shell attach fittings (ref: steps 6-9, sec 7).-cut angle stock to length for the 16 fittings, and began finishing to final size-
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sportsman 2 + 2 Home
Category
# Logs
# Hours
All
92
276
Empennage
11
23
Flight controls
1
1
Fuselage
52
155
Landing gear
1
0
Receive and inv.
5
38
System Installation
12
22
Wings
10
37
Copyright © 2001-2024 Matronics. All Rights Reserved.