Powered By Kitlog Pro v2.0
Chuck S. Sportsman 2 +2 Site
Sportsman 2 + 2
All
10-4-2006
< Previous Log Entry
Next Log Entry >
Date:
10-4-2006
Number of Hours:
2.00
Manual Reference:
Brief Description:
Elev Step 85 Rivet trim tab hinge half to elevator
-hinge half riveted to elevator with flush rivets-started in center and worked outward equally on both sides -hinge reassembled temporarily and trim tab checked for clearances
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sportsman 2 + 2 Home
Category
# Logs
# Hours
All
92
276
Empennage
11
23
Flight controls
1
1
Fuselage
52
155
Landing gear
1
0
Receive and inv.
5
38
System Installation
12
22
Wings
10
37
Copyright © 2001-2024 Matronics. All Rights Reserved.