-inspect elevator trim tab for damage and completeness of factory assembly-determine electric trim installation requirements (no counterweight arm)-remove factory pop rivets and disassemble trim tab-deburr and clean all parts-flush rivet trim tab ribs to upper surface, 2 man job, very thin bucking bar required-rivet control horn and 2 supporting ribs to lower skin