-Reviewed steps 22-24 for the routing of the cables.-Placed strings around the forward pulleys to their control arms to represent how the cables would be run.-Once the pulleys were aligned with the control arms, the distance was measured for each spacer with a vernier calliper. The spacers were cut one at a time and installed so the appropriate clearance could be kept between each pulley.-Deburred pulley guards and removed rough edges from the spacers.-Etched the guards, spacer and aluminium tube.-Sprayed epoxy primer on all the parts.