KitLog pro

Powered By Kitlog Pro v2.0

Chuck S. Sportsman 2 +2 Site
' style=
Date:  10-19-2006
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Stabilizer installation

-mixed 2 batches of resin (40 grams each) and layed up 4 layers of heavy unidirectional cloth on bulkhead E -aluminum plate covered with barrier tape and clamped over wet cloth to ensure bulkhead thickness maintained
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.