Powered By Kitlog Pro v2.0
Chuck S. Sportsman 2 +2 Site
Sportsman 2 + 2
All
10-19-2006
< Previous Log Entry
Next Log Entry >
Date:
10-19-2006
Number of Hours:
2.50
Manual Reference:
Brief Description:
Stabilizer installation
-mixed 2 batches of resin (40 grams each) and layed up 4 layers of heavy unidirectional cloth on bulkhead E -aluminum plate covered with barrier tape and clamped over wet cloth to ensure bulkhead thickness maintained
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sportsman 2 + 2 Home
Category
# Logs
# Hours
All
92
276
Empennage
11
23
Flight controls
1
1
Fuselage
52
155
Landing gear
1
0
Receive and inv.
5
38
System Installation
12
22
Wings
10
37
Copyright © 2001-2024 Matronics. All Rights Reserved.