-drilled the 40 number 12 bolt holes in that connect the 12 fittings to the shell-removed all fittings, inspected q-cell for proper curing, and de-burred all bolt holes -countersunk all bolt holes in the shell to accommodate flush mount screws, micro-countersink was impractical for this task due to curvatures of the surface