KitLog pro

Powered By Kitlog Pro v2.0

Scotts Kitfox Sport project
' style=
Date:  9-11-2005
Number of Hours:  3.70
Manual Reference:  
Brief Description:  Fabric covering.

Bonded fabric to lower surface of elevator with Polytack. Then heatsmoothed edges and shrunk fabric at 250 deg. Also Heatsmoothed and shrunk fabric on rudder at 350 deg.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.