Powered By Kitlog Pro v2.0
Scotts Kitfox Sport project
Kitfox Sport
All
6-8-2004
< Previous Log Entry
Next Log Entry >
Date:
6-8-2004
Number of Hours:
5.20
Manual Reference:
Brief Description:
Fuselage fabric covering.
Finished gluing R/H fabric to structure. Shrunk fabric at 350 deg. Turned fuselage over onto the other side and rolled out fabric on L/H side. And bonded fabric to structure and belly fabric. Then shrunk fabric at 350 deg on the L/H side.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Kitfox Sport Home
Category
# Logs
# Hours
All
429
1145
Avionics
14
31
Engine
29
33
Engine installation
4
7
Fabric covering
74
295
Final assembly
38
88
Fuselage
88
185
Horizontail Stabiliz
17
42
Landing gear
12
18
Miscellaneous
38
82
Paint
26
124
Prop
2
1
Strut Fairings
12
13
Wings
64
192
Wingtip
11
34
Copyright © 2001-2024 Matronics. All Rights Reserved.